This is the forming for the foundation walls on the upper part of the main floor. Frost line here is only 2′ so the foundation walls only have to be 2′ higher than the bottom of the footings.
This is the forming for the 10′ foundation wall of the basement. The upper level is on the other side of this wall. You can see the steel rebar that will end up in the centre of the wall.
October 24 – Upper level foundation after forms have been stripped.
Basement foundation walls after the forms have been stripped
The opening to the wine cellar (although at the rate we are going, I expect we will only be able to afford putting in a couple of cases of beer).