Phase 1 -Siting the House

deciding-approach

We decided this would be the best (actually the only) possible approach to the desired site for the house. It meant going up a bit higher, but it got us to a “bench” where the land was a bit more level and the view was great.

laying-out-house1

This is the laying out of the house on the site. It took several days to figure out the exact location and orientation.

laying-out-house2

There was very little dirt on the site – maybe 10 centimeters of dirt overtop of the rock.

laying-out-house3

I learned some surveying skills – Pat ran the transit as I ran the rod.

laying-out-garage

This is the layout for the garage and shop.

laying-out-parking

This is the layout for the parking/driveway in front of the garage. The basic idea was to preserve as much of the natural setting as possible.